CHIPOLBROK – “PADEREWSKI“ voy. 12 - Maiden call at Emden

After loading in Hamburg a portion of project and break bulk cargo, amongst those a gas turbine of 330ts unit weight, m/v „PADEREWSKI“ proceeded to Emden for its maiden call. The plan was to load during a quick stop 38 pcs / 538mts / roughly 3.400 FRT of wind power equipment supplied from a local producer destined to Masan in Korea. Maximum parameters of this cargo are 22ts unit weight and 40,60m length. This project is controlled by Japanese logistics provider being present during the entire duration of loading operations. Under whose critical views loading, tight stowing and lashing of cargo was arranged by busy stevedores within 36 hours so that the vessel could depart soon next early morning to the first transit port being Suez for canal passage. Thereafter calls at Mumbai, Singapore, Kaohsiung and Shanghai are in the schedule until vessel is estimated to arrive at disport Masan end of September. Next ports will be then Yantai and Dalian to become empty and to get a new employment for Capt. Bogusłav Jeszierski and his crew for a new global round trip. 20th of July 2019 / OP